ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month January 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigartion/     Water system Public Buildings Street Lights Industrial Industrial Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.1972   6.1972   6.1972   6.1972   6.1972   6.1972   6.1972   6.1972   6.1972   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  219.4100   219.4100   219.4100 
Transmission System Charge (Php/kWh)  0.8755   0.8755   1.0202   1.0202   1.0202   1.0202   1.0202   -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.7135   0.7135   0.7135   0.7135   0.7135   0.7135   0.7135   0.7135   0.7135   0.7135 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1805   0.1805   0.1805   0.1805   0.1805   0.1805   0.1805   0.1805   0.1805 
Missionary Electrification-Renewable Energy Developers
 0.0017   0.0017   0.0017   0.0017   0.0017   0.0017   0.0017   0.0017   0.0017 
Environmental Charge  -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.6886   0.6886   0.6886   0.6886   0.6886   0.6886   0.6886   0.6886   0.6886   -   
Transmission Vat (Php/kWh)  0.0872   0.0872   0.1017   0.1017   0.1017   0.1017   0.1017   0.0836   0.0836   0.0836 
System Loss  Vat  (PhP/kWh)  0.0780   0.0780   0.0780   0.0780   0.0780   0.0780   0.0780   0.0780   0.0780   0.0780 
 Distribution Vat  0.1876   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0043   0.0043   0.0043   0.0043   0.0043   0.0043   0.0043   0.0043   0.0043 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  9.6614   9.3481   8.9308   8.9308   8.9308   8.9308   8.9308   7.4665   7.4665   1.1855 
12% Vat on Rate Per kWh  1.0413   1.0412   0.9508   0.9508   0.9508   0.9508   0.9508   0.8794   0.8794   0.1908   
Rate per kWh Including VAT  10.7027   10.3893   9.8816   9.8816   9.8816   9.8816   9.8816   8.3459   8.3459   1.3764 
Other LGUs  10.7027   10.3893   9.8816   9.8816   9.8816   9.8816   9.8816   8.3459   8.3459 
Cabugao LGU  10.7027   10.3893   9.8816   9.8816   9.8816   9.8816   9.8816   8.3459   8.3459 
Candon LGU  10.7027   10.3893   9.8816   9.8816   9.8816   9.8816   9.8816   8.3459   8.3459 
Narvacan LGU  10.7027   10.3893   9.8816   9.8816   9.8816   9.8816   9.8816   8.3459   8.3459 
Santiago LGU  10.7027   10.3893   9.8816   9.8816   9.8816   9.8816   9.8816   8.3459   8.3459 
Sta. Cruz LGU  10.7027   10.3893   9.8816   9.8816   9.8816   9.8816   9.8816   8.3459   8.3459 
Vigan LGU  10.7027   10.3893   9.8816   9.8816   9.8816   9.8816   9.8816   8.3459   8.3459 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month January 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO Sallacong & Matibuey
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage Residential
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial BAPA Commercial Pub. Bldg. Commercial BAPA
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  7.4956   7.4956   7.4956   7.4956   7.4956   7.4956   8.5257   8.5257   8.5257   8.5257   6.1972 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)  0.8755 
3 SYSTEM LOSS CHARGE (Php/kWh)  0.8811   0.8811   0.8811   0.8811   0.8811   0.8811   (0.1616)  (0.1616)  (0.1616)  (0.1616)  0.7135 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   -     -     -     167.56   -   
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     0.4613   0.4441   0.4441   -     0.4613 
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   -     46.60   46.60   46.60   -   
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     0.5376   -     -     -     0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78   5.00 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     0.3205   -     -     -     0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1805   0.1805   0.1805   0.1805   0.1805   0.1805   0.1805   0.1805   0.1805   0.1805 
Missionary Electrification-Renewable Energy Developers  0.0017   0.0017   0.0017   0.0017   0.0017   0.0017   0.0017   0.0017   0.0017   0.0017 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.7119   0.7119   0.7119   0.7119   0.7119   0.7119   0.9230   0.9230   0.9230   0.9230   0.6886 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     0.0872 
System Loss  Vat  (PhP/kWh)  0.0813   0.0813   0.0813   0.0813   0.0813   0.0813   0.0014   0.0014   0.0014   0.0014   0.0780 
 Distribution Vat  0.1876   0.1490   0.0825   0.0825   0.0825   0.0292   0.1876   0.0825   0.0825   0.0292   0.1876 
GRAM Rate - VAT Charge (Php/kWh)  -   
ICERA Rate - VAT Charge (Php/kWh)  -   
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0043   0.0043   0.0043   0.0043   0.0043   0.0043   0.0043   0.0043   0.0043   0.0043 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  10.2519   9.6180   9.3766   9.3766   9.3766   8.9325   10.2393   9.3640   9.3640   8.9199   9.6614 
12% Vat on Rate Per kWh  0.9808   0.9422   0.8757   0.8757   0.8757   0.8224   1.1119   1.0068   1.0068   0.9535   1.0413 
Rate per kWh Including VAT  11.2326   10.5602   10.2523   10.2523   10.2523   9.7549   11.3512   10.3709   10.3709   9.8735   10.7027 
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38   5.00 
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53   0.60 
Distribution Demand Charge (Per kW)  167.56   167.56   -   
12% Vat on Distribution Demand Charge  20.11   20.11   -   
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month February 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigartion/     Water system Public Buildings Street Lights Industrial Industrial Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.6967   6.6967   6.6967   6.6967   6.6967   6.6967   6.6967   6.6967   6.6967   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  205.6300   205.6300   205.6300 
Transmission System Charge (Php/kWh)  0.9384   0.9384   1.0675   1.0675   1.0675   1.0675   1.0675   -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.7817   0.7817   0.7817   0.7817   0.7817   0.7817   0.7817   0.7817   0.7817   0.7817 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.6934   0.6934   0.6934   0.6934   0.6934   0.6934   0.6934   0.6934   0.6934   -   
Transmission Vat (Php/kWh)  0.0910   0.0910   0.1033   0.1033   0.1033   0.1033   0.1033   0.0807   0.0807   0.0807 
System Loss  Vat  (PhP/kWh)  0.0784   0.0784   0.0784   0.0784   0.0784   0.0784   0.0784   0.0784   0.0784   0.0784 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0132   0.0132   0.0132   0.0132   0.0132   0.0132   0.0132   0.0132   0.0132 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  10.3183   9.9786   9.5721   9.5721   9.5721   9.5721   9.5721   8.0605   8.0605   1.2800 
12% Vat on Rate Per kWh  1.0503   1.0502   0.9576   0.9576   0.9576   0.9576   0.9576   0.8818   0.8818   0.1884   
Rate per kWh Including VAT  11.3686   11.0289   10.5297   10.5297   10.5297   10.5297   10.5297   8.9423   8.9423   1.4684 
Other LGUs  11.3686   11.0289   10.5297   10.5297   10.5297   10.5297   10.5297   8.9423   8.9423 
Cabugao LGU  11.3686   11.0289   10.5297   10.5297   10.5297   10.5297   10.5297   8.9423   8.9423 
Candon LGU  11.3686   11.0289   10.5297   10.5297   10.5297   10.5297   10.5297   8.9423   8.9423 
Narvacan LGU  11.3686   11.0289   10.5297   10.5297   10.5297   10.5297   10.5297   8.9423   8.9423 
Santiago LGU  11.3686   11.0289   10.5297   10.5297   10.5297   10.5297   10.5297   8.9423   8.9423 
Sta. Cruz LGU  11.3686   11.0289   10.5297   10.5297   10.5297   10.5297   10.5297   8.9423   8.9423 
Vigan LGU  11.3686   11.0289   10.5297   10.5297   10.5297   10.5297   10.5297   8.9423   8.9423 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month February 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO Sallacong & Matibuey
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage Residential
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial BAPA Commercial Pub. Bldg. Commercial BAPA
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  7.1263   7.1263   7.1263   7.1263   7.1263   7.1263   7.8406   7.8406   7.8406   7.8406   6.6967 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)  0.9384 
3 SYSTEM LOSS CHARGE (Php/kWh)  0.8281   0.8281   0.8281   0.8281   0.8281   0.8281   (0.7303)  (0.7303)  (0.7303)  (0.7303)  0.7817 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   -     -     -     167.56   -   
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     0.4613   0.4441   0.4441   -     0.4613 
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   -     46.60   46.60   46.60   -   
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     0.5376   -     -     -     0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78   5.00 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     0.3205   -     -     -     0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.7044   0.7044   0.7044   0.7044   0.7044   0.7044   0.8789   0.8789   0.8789   0.8789   0.6934 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     0.0910 
System Loss  Vat  (PhP/kWh)  0.0804   0.0804   0.0804   0.0804   0.0804   0.0804   0.0023   0.0023   0.0023   0.0023   0.0784 
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.1875   0.0825   0.0825   0.0292   0.1875 
GRAM Rate - VAT Charge (Php/kWh)  -   
ICERA Rate - VAT Charge (Php/kWh)  -   
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838   0.0838 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0132   0.0132   0.0132   0.0132   0.0132   0.0132   0.0132   0.0132   0.0132   0.0132 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  9.8559   9.1958   8.9806   8.9806   8.9806   8.5365   9.0118   8.1365   8.1365   7.6924   10.3183 
12% Vat on Rate Per kWh  0.9724   0.9338   0.8674   0.8674   0.8674   0.8141   1.0687   0.9636   0.9636   0.9104   1.0503 
Rate per kWh Including VAT  10.8283   10.1296   9.8480   9.8480   9.8480   9.3506   10.0804   9.1001   9.1001   8.6027   11.3686   -   
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38   5.00    
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53   0.60 
Distribution Demand Charge (Per kW)  167.56   167.56   -   
12% Vat on Distribution Demand Charge  20.11   20.11   -   
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month March 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigartion/     Water system Public Buildings Street Lights Industrial Industrial Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  4.7433   4.7433   4.7433   4.7433   4.7433   4.7433   4.7433   4.7433   4.7433   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  236.7200   236.7200   236.7200 
Transmission System Charge (Php/kWh)  0.9997   0.9997   1.1344   1.1344   1.1344   1.1344   1.1344   -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.5798   0.5798   0.5798   0.5798   0.5798   0.5798   0.5798   0.5798   0.5798   0.5798 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5112   0.5112   0.5112   0.5112   0.5112   0.5112   0.5112   0.5112   0.5112   -   
Transmission Vat (Php/kWh)  0.1035   0.1035   0.1174   0.1174   0.1174   0.1174   0.1174   0.0931   0.0931   0.0931 
System Loss  Vat  (PhP/kWh)  0.0620   0.0620   0.0620   0.0620   0.0620   0.0620   0.0620   0.0620   0.0620   0.0620 
 Distribution Vat  0.1876   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0008   0.0008   0.0008   0.0008   0.0008   0.0008   0.0008   0.0008   0.0008 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  8.2468   7.8848   7.5062   7.5062   7.5062   7.5062   7.5062   5.9277   5.9277   1.0655 
12% Vat on Rate Per kWh  0.8642   0.8641   0.7731   0.7731   0.7731   0.7731   0.7731   0.6955   0.6955   0.1843 
Rate per kWh Including VAT  9.1110   8.7489   8.2794   8.2794   8.2794   8.2794   8.2794   6.6232   6.6232   1.2498 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11 
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated
January 11, 2010 on Case No. 2009-088 RC with provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month March 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO Sallacong & Matibuey
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage Residential
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial BAPA Commercial Pub. Bldg. Commercial BAPA
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.4580   6.4580   6.4580   6.4580   6.4580   6.4580   9.0379   9.0379   9.0379   9.0379   4.7433 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)  0.9997 
3 SYSTEM LOSS CHARGE (Php/kWh)  0.7672   0.7672   0.7672   0.7672   0.7672   0.7672   (0.0090)  (0.0090)  (0.0090)  (0.0090)  0.5798 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   -     -     -     167.56   -   
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     0.4613   0.4441   0.4441   -     0.4613 
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   -     46.60   46.60   46.60   -   
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     0.5376   -     -     -     0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78   5.00 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     0.3205   -     -     -     0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5946   0.5946   0.5946   0.5946   0.5946   0.5946   0.9842   0.9842   0.9842   0.9842   0.5112 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     0.1035 
System Loss  Vat  (PhP/kWh)  0.0679   0.0679   0.0679   0.0679   0.0679   0.0679   (0.0010)  (0.0010)  (0.0010)  (0.0010)  0.0620 
 Distribution Vat  0.1876   0.1490   0.0825   0.0825   0.0825   0.0292   0.1876   0.0825   0.0825   0.0292   0.1876 
GRAM Rate - VAT Charge (Php/kWh)  -   
ICERA Rate - VAT Charge (Php/kWh)  -   
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0008   0.0008   0.0008   0.0008   0.0008   0.0008   0.0008   0.0008   0.0008   0.0008 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003   0.0003 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  9.1492   8.4666   8.2739   8.2739   8.2739   7.8298   10.9528   10.0775   10.0775   9.6334   8.2468 
12% Vat on Rate Per kWh  0.8501   0.8115   0.7450   0.7450   0.7450   0.6917   1.1708   1.0657   1.0657   1.0124   0.8642 
Rate per kWh Including VAT  9.9993   9.2781   9.0189   9.0189   9.0189   8.5215   12.1236   11.1432   11.1432   10.6458   9.1110 
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38   5.00 
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53   0.60 
Distribution Demand Charge (Per kW)  167.56   167.56   -   
12% Vat on Distribution Demand Charge  20.11   20.11   -   
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated January 11, 2010 on Case No. 2009-088 RC with
provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month April 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigartion/     Water system Public Buildings Street Lights Industrial Industrial Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  5.8167   5.8167   5.8167   5.8167   5.8167   5.8167   5.8167   5.8167   5.8167   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  230.7500   230.7500   230.7500 
Transmission System Charge (Php/kWh)  1.0961   1.0961   1.2454   1.2454   1.2454   1.2454   1.2454   -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.6885   0.6885   0.6885   0.6885   0.6885   0.6885   0.6885   0.6885   0.6885   0.6885 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5598   0.5598   0.5598   0.5598   0.5598   0.5598   0.5598   0.5598   0.5598   -   
Transmission Vat (Php/kWh)  0.1203   0.1203   0.1367   0.1367   0.1367   0.1367   0.1367   0.1085   0.1085   0.1085 
System Loss  Vat  (PhP/kWh)  0.0678   0.0678   0.0678   0.0678   0.0678   0.0678   0.0678   0.0678   0.0678   0.0678 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0007   0.0007   0.0007   0.0007   0.0007   0.0007   0.0007   0.0007   0.0007 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  9.5251   9.1632   8.7991   8.7991   8.7991   8.7991   8.7991   7.1096   7.1096   1.1740 
12% Vat on Rate Per kWh  0.9354   0.9353   0.8467   0.8467   0.8467   0.8467   0.8467   0.7653   0.7653   0.2055   
Rate per kWh Including VAT  10.4605   10.0984   9.6458   9.6458   9.6458   9.6458   9.6458   7.8748   7.8748   1.3795 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11 
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated
January 11, 2010 on Case No. 2009-088 RC with provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month April 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO Sallacong & Matibuey
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage Residential
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial BAPA Commercial Pub. Bldg. Commercial BAPA
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.1186   6.1186   6.1186   6.1186   6.1186   6.1186   9.0019   9.0019   9.0019   9.0019   5.8167 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)  1.0961 
3 SYSTEM LOSS CHARGE (Php/kWh)  0.7263   0.7263   0.7263   0.7263   0.7263   0.7263   0.0531   0.0531   0.0531   0.0531   0.6885 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   -     -     -     167.56   -   
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     0.4613   0.4441   0.4441   -     0.4613 
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   -     46.60   46.60   46.60   -   
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     0.5376   -     -     -     0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78   5.00 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     0.3205   -     -     -     0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.6087   0.6087   0.6087   0.6087   0.6087   0.6087   0.9856   0.9856   0.9856   0.9856   0.5598 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     0.1203 
System Loss  Vat  (PhP/kWh)  0.0695   0.0695   0.0695   0.0695   0.0695   0.0695   0.0058   0.0058   0.0058   0.0058   0.0678 
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.1875   0.0825   0.0825   0.0292   0.1875 
GRAM Rate - VAT Charge (Php/kWh)  -   
ICERA Rate - VAT Charge (Php/kWh)  -   
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0007   0.0007   0.0007   0.0007   0.0007   0.0007   0.0007   0.0007   0.0007   0.0007 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  8.7687   8.0863   7.8934   7.8934   7.8934   7.4493   10.9788   10.1035   10.1035   9.6594   9.5251 
12% Vat on Rate Per kWh  0.8657   0.8272   0.7607   0.7607   0.7607   0.7074   1.1790   1.0740   1.0740   1.0207   0.9354 
Rate per kWh Including VAT  9.6345   8.9135   8.6541   8.6541   8.6541   8.1567   12.1578   11.1775   11.1775   10.6801   10.4605 
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38   5.00 
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53   0.60 
Distribution Demand Charge (Per kW)  167.56   167.56   -   
12% Vat on Distribution Demand Charge  20.11   20.11   -   
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated January 11, 2010 on Case No. 2009-088 RC with
provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month May 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigartion/     Water system Public Buildings Street Lights Industrial Industrial Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  5.2210   5.2210   5.2210   5.2210   5.2210   5.2210   5.2210   5.2210   5.2210   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  179.6800   179.6800   179.6800 
Transmission System Charge (Php/kWh)  0.7190   0.7190   0.8178   0.8178   0.8178   0.8178   0.8178   -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.5977   0.5977   0.5977   0.5977   0.5977   0.5977   0.5977   0.5977   0.5977   0.5977 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5304   0.5304   0.5304   0.5304   0.5304   0.5304   0.5304   0.5304   0.5304   -   
Transmission Vat (Php/kWh)  0.0770   0.0770   0.0875   0.0875   0.0875   0.0875   0.0875   0.0696   0.0696   0.0696 
System Loss  Vat  (PhP/kWh)  0.0611   0.0611   0.0611   0.0611   0.0611   0.0611   0.0611   0.0611   0.0611   0.0611 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  8.4614   8.0996   7.6849   7.6849   7.6849   7.6849   7.6849   6.4230   6.4230   1.0831 
12% Vat on Rate Per kWh  0.8561   0.8560   0.7616   0.7616   0.7616   0.7616   0.7616   0.6904   0.6904   0.1600   
Rate per kWh Including VAT  9.3175   8.9556   8.4465   8.4465   8.4465   8.4465   8.4465   7.1134   7.1134   1.2430 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11 
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated
January 11, 2010 on Case No. 2009-088 RC with provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
Prepared by:  Checked by:  Reviewed by: Approved by:
IONE E. ORPILLA JOYMA A. PONCE VIRNA CRISTINA E. VALDEZ LAWRENCE A. SEVERO
Acting Accountant Acting Finance Manager Acting Internal Audit Manager General Manager
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month May 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO Sallacong & Matibuey
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage Residential
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial BAPA Commercial Pub. Bldg. Commercial BAPA
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  8.5645   8.5645   8.5645   8.5645   8.5645   8.5645   9.8305   9.8305   9.8305   9.8305   5.2210 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)  0.7190 
3 SYSTEM LOSS CHARGE (Php/kWh)  1.0166   1.0166   1.0166   1.0166   1.0166   1.0166   (0.0403)  (0.0403)  (0.0403)  (0.0403)  0.5977 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   -     -     -     167.56   -   
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     0.4613   0.4441   0.4441   -     0.4613 
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   -     46.60   46.60   46.60   -   
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     0.5376   -     -     -     0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78   5.00 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     0.3205   -     -     -     0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.8179   0.8179   0.8179   0.8179   0.8179   0.8179   1.0240   1.0240   1.0240   1.0240   0.5304 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     0.0770 
System Loss  Vat  (PhP/kWh)  0.0934   0.0934   0.0934   0.0934   0.0934   0.0934   (0.0042)  (0.0042)  (0.0042)  (0.0042)  0.0611 
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.1875   0.0825   0.0825   0.0292   0.1875 
GRAM Rate - VAT Charge (Php/kWh)  -   
ICERA Rate - VAT Charge (Php/kWh)  -   
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  11.5047   10.8225   10.6294   10.6294   10.6294   10.1853   11.7138   10.8385   10.8385   10.3944   8.4614 
12% Vat on Rate Per kWh  1.0988   1.0602   0.9937   0.9937   0.9937   0.9405   1.2073   1.1023   1.1023   1.0490   0.8561 
Rate per kWh Including VAT  12.6035   11.8827   11.6232   11.6232   11.6232   11.1258   12.9211   11.9408   11.9408   11.4434   9.3175   -   
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38   5.00    
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53   0.60 
Distribution Demand Charge (Per kW)  167.56   167.56   -   
12% Vat on Distribution Demand Charge  20.11   20.11   -   
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated January 11, 2010 on Case No. 2009-088 RC with
provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
Prepared by:  Checked by:  Reviewed by: Approved by:
IONE E. ORPILLA JOYMA A. PONCE VIRNA CRISTINA E. VALDEZ LAWRENCE A. SEVERO
Acting Accountant Acting Finance Manager Acting Internal Audit Manager General Manager
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month June 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigartion/     Water system Public Buildings Street Lights Industrial Industrial Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  5.0459   5.0459   5.0459   5.0459   5.0459   5.0459   5.0459   5.0459   5.0459   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  216.0200   216.0200   216.0200 
Transmission System Charge (Php/kWh)  0.8015   0.8015   0.9128   0.9128   0.9128   0.9128   0.9128   -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.5802   0.5802   0.5802   0.5802   0.5802   0.5802   0.5802   0.5802   0.5802   0.5802 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5227   0.5227   0.5227   0.5227   0.5227   0.5227   0.5227   0.5227   0.5227   -   
Transmission Vat (Php/kWh)  0.0862   0.0862   0.0981   0.0981   0.0981   0.0981   0.0981   0.0826   0.0826   0.0826 
System Loss  Vat  (PhP/kWh)  0.0604   0.0604   0.0604   0.0604   0.0604   0.0604   0.0604   0.0604   0.0604   0.0604 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  8.3512   7.9895   7.5871   7.5871   7.5871   7.5871   7.5871   6.2302   6.2302   1.0654 
12% Vat on Rate Per kWh  0.8567   0.8566   0.7637   0.7637   0.7637   0.7637   0.7637   0.6949   0.6949   0.1722   
Rate per kWh Including VAT  9.2079   8.8462   8.3508   8.3508   8.3508   8.3508   8.3508   6.9251   6.9251   1.2377 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11 
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated
January 11, 2010 on Case No. 2009-088 RC with provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
Prepared by:  Checked by:  Reviewed by: Approved by:
IONE E. ORPILLA JOYMA A. PONCE VIRNA CRISTINA E. VALDEZ LAWRENCE A. SEVERO
Acting Accountant Acting Finance Manager Acting Internal Audit Manager General Manager
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month June 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO Sallacong & Matibuey
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage Residential
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial BAPA Commercial Pub. Bldg. Commercial BAPA
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  7.2685   7.2685   7.2685   7.2685   7.2685   7.2685   8.3905   8.3905   8.3905   8.3905   5.0459 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)  0.8015 
3 SYSTEM LOSS CHARGE (Php/kWh)  0.8671   0.8671   0.8671   0.8671   0.8671   0.8671   (0.0117)  (0.0117)  (0.0117)  (0.0117)  0.5802 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   -     -     -     167.56   -   
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     0.4613   0.4441   0.4441   -     0.4613 
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   -     46.60   46.60   46.60   -   
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     0.5376   -     -     -     0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78   5.00 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     0.3205   -     -     -     0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.7286   0.7286   0.7286   0.7286   0.7286   0.7286   0.8990   0.8990   0.8990   0.8990   0.5227 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     0.0862 
System Loss  Vat  (PhP/kWh)  0.0832   0.0832   0.0832   0.0832   0.0832   0.0832   (0.0012)  (0.0012)  (0.0012)  (0.0012)  0.0604 
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.1875   0.0825   0.0825   0.0292   0.1875 
GRAM Rate - VAT Charge (Php/kWh)  -   
ICERA Rate - VAT Charge (Php/kWh)  -   
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  10.0592   9.3771   9.1839   9.1839   9.1839   8.7398   10.3023   9.4270   9.4270   8.9829   8.3512 
12% Vat on Rate Per kWh  0.9993   0.9608   0.8943   0.8943   0.8943   0.8410   1.0853   0.9803   0.9803   0.9270   0.8567 
Rate per kWh Including VAT  11.0586   10.3379   10.0782   10.0782   10.0782   9.5808   11.3876   10.4073   10.4073   9.9099   9.2079   -   
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38   5.00    
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53   0.60 
Distribution Demand Charge (Per kW)  167.56   167.56   -   
12% Vat on Distribution Demand Charge  20.11   20.11   -   
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated January 11, 2010 on Case No. 2009-088 RC with
provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
Prepared by:  Checked by:  Reviewed by: Approved by:
IONE E. ORPILLA JOYMA A. PONCE VIRNA CRISTINA E. VALDEZ LAWRENCE A. SEVERO
Acting Accountant Acting Finance Manager Acting Internal Audit Manager General Manager
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month July 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigartion/     Water system Public Buildings Street Lights Industrial Industrial Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  4.8195   4.8195   4.8195   4.8195   4.8195   4.8195   4.8195   4.8195   4.8195   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  219.6400   219.6400   219.6400 
Transmission System Charge (Php/kWh)  0.8668   0.8668   1.0133   1.0133   1.0133   1.0133   1.0133   -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.5648   0.5648   0.5648   0.5648   0.5648   0.5648   0.5648   0.5648   0.5648   0.5648 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.4835   0.4835   0.4835   0.4835   0.4835   0.4835   0.4835   0.4835   0.4835   -   
Transmission Vat (Php/kWh)  0.0936   0.0936   0.1094   0.1094   0.1094   0.1094   0.1094   0.0899   0.0899   0.0899 
System Loss  Vat  (PhP/kWh)  0.0573   0.0573   0.0573   0.0573   0.0573   0.0573   0.0573   0.0573   0.0573   0.0573 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  8.1747   7.8130   7.4459   7.4459   7.4459   7.4459   7.4459   5.9885   5.9885   1.0500 
12% Vat on Rate Per kWh  0.8219   0.8219   0.7327   0.7327   0.7327   0.7327   0.7327   0.6599   0.6599   0.1764   
Rate per kWh Including VAT  8.9966   8.6349   8.1786   8.1786   8.1786   8.1786   8.1786   6.6483   6.6483   1.2264 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11 
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated
January 11, 2010 on Case No. 2009-088 RC with provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month July 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO Sallacong & Matibuey
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage Residential
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial BAPA Commercial Pub. Bldg. Commercial Pub. Bldg. BAPA
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.9497   6.9497   6.9497   6.9497   6.9497   6.9497   8.4485   8.4485   8.4485   8.4485   8.4485   4.8195  Generation System Charge(Php / kWh)  4.8195   -   
2 TRANSMISSION CHARGE TRANSMISSION CHARGE  -     -   
Demand Charge (Php / kW) Demand Charge (Php / kW)  -     -   
Transmission System Charge (Php/kWh)  0.8668  Transmission System Charge (Php/kWh)  0.8668   -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.8256   0.8256   0.8256   0.8256   0.8256   0.8256   (0.0532)  (0.0532)  (0.0532)  (0.0532)  (0.0532)  0.5648  SYSTEM LOSS CHARGE (Php/kWh)  0.5648   -   
System Loss Refund - January 2014 (Php/kWh) System Loss Refund - January 2014 (Php/kWh)  -     -   
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE DISTRIBUTION CHARGE  -     -   
Demand Charge (Php/kW)  -     -     -     -     -     167.56   -     -     -     167.56   167.56   -    Demand Charge (Php/kW)  -     -   
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     0.4613   0.4441   0.4441   -     -     0.4613  Distribution System Charge (Php/kWh)  0.4613   -   
5 SUPPLY CHARGE SUPPLY CHARGE  -     -   
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   -     46.60   46.60   46.60   46.60   -    Retail Customer Charge (Php/customer/mo.)  -     -   
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     0.5376   -     -     -     -     0.5376  Supply System Charge (Php/kWh)  0.5376   -   
6 METERING CHARGE METERING CHARGE  -     -   
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78   32.78   5.00  Retail Customer Charge (Php/Customer/mo)  5.0000   -   
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     0.3205   -     -     -     -     0.3205  Metering System Charge (Php/kWh)  0.3205   -   
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178  RFSC (PhP/kWh)  0.2178   -   
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -     -    RFSC - Debt Service (PhP/kWh)  -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247  RFSC - Debt Service 2 (PhP/kWh)  0.0247   -   
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES UNIVERSAL CHARGES  -     -   
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949  Missionary Electrification-NPC-SPUG  0.1949   -   
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044  Missionary Electrification-Renewable Energy Developers  0.0044   -   
Environmental Charge  -     -     -     -     -     -     -     -     -     -     -    Environmental Charge  -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -     -    NPC Stranded Contract Cost  -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428  NPC Stranded Debt  0.0428   -   
11 VALUE ADDED TAX VALUE ADDED TAX  -     -   
Generation Vat  (Php/kWh)  0.7166   0.7166   0.7166   0.7166   0.7166   0.7166   0.9296   0.9296   0.9296   0.9296   0.9296   0.4835  Generation Vat  (Php/kWh)  0.4835   -   
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -     0.0936  Transmission Vat (Php/kWh)  0.0936   -   
System Loss  Vat  (PhP/kWh)  0.0818   0.0818   0.0818   0.0818   0.0818   0.0818   (0.0058)  (0.0058)  (0.0058)  (0.0058)  (0.0058)  0.0573  System Loss  Vat  (PhP/kWh)  0.0573   -   
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.1875   0.0825   0.0825   0.0292   0.0292   0.1875   Distribution Vat  0.1875   -   
GRAM Rate - VAT Charge (Php/kWh)  -    GRAM Rate - VAT Charge (Php/kWh)  -     -   
ICERA Rate - VAT Charge (Php/kWh)  -    ICERA Rate - VAT Charge (Php/kWh)  -     -   
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189  FIT-All (Renewable) (PhP/kWh)  0.1189   -   
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005  LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   -   
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002  SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   -   
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  9.6989   9.0167   8.8236   8.8236   8.8236   8.3795   10.3189   9.4436   9.4436   8.9995   8.9995   8.1747  RATE per KWH  8.1747   -   
12% Vat on Rate Per kWh  0.9860   0.9474   0.8809   0.8809   0.8809   0.8276   1.1113   1.0062   1.0062   0.9529   0.9529   0.8219  12% Vat on Rate Per kWh  0.8219   -   
Rate per kWh Including VAT  10.6848   9.9641   9.7045   9.7045   9.7045   9.2071   11.4301   10.4498   10.4498   9.9524   9.9524   8.9966  Rate per kWh Including VAT  8.9966   -     -   
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38   79.38   5.00  Rate per Customer Charge  5.0000   -      
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53   9.53   0.60  12% VAT on Customer Charge  0.6000   -   
Distribution Demand Charge (Per kW)  167.56   167.56   167.56   -    Distribution Demand Charge (Per kW)  -     -   
12% Vat on Distribution Demand Charge  20.11   20.11   20.11   -    12% Vat on Distribution Demand Charge  -     -   
NOTES: 
1. ISECO's distribution wheeling charges were based on the Rules for Setting the Electric Cooperatives Wheeling Rates (RSEC-WR) as embodied in  ERC order dated January 11, 2010 on Case No. 2009-088 RC with
provisional authority.
2. In a letter received from PSALM dated January 14, 2025 ISECO was directed to collect the approved interim UC-ME rate amounting to Php0.1993/kWh, 
effective February 2025 billing period until otherwise changed by the Commission
3. ERC issued Notice of Resolution for ERC Case No. 2023-096RC authorizing TransCo to collect a FIT-All equivalent to Php0.1189/kWh effective March 2025 billing. 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month August 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigartion/     Water system Public Buildings Street Lights Industrial Industrial Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  5.3781   5.3781   5.3781   5.3781   5.3781   5.3781   5.3781   5.3781   5.3781   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  232.1000   232.1000   232.1000 
Transmission System Charge (Php/kWh)  1.1085   1.1085   1.1329   1.1329   1.1329   1.1329   1.1329   -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.6308   0.6308   0.6308   0.6308   0.6308   0.6308   0.6308   0.6308   0.6308   0.6308 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5690   0.5690   0.5690   0.5690   0.5690   0.5690   0.5690   0.5690   0.5690   -   
Transmission Vat (Php/kWh)  0.1217   0.1217   0.1244   0.1244   0.1244   0.1244   0.1244   0.1050   0.1050   0.1050 
System Loss  Vat  (PhP/kWh)  0.0672   0.0672   0.0672   0.0672   0.0672   0.0672   0.0672   0.0672   0.0672   0.0672 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  9.0411   8.6793   8.1901   8.1901   8.1901   8.1901   8.1901   6.6132   6.6132   1.1162 
12% Vat on Rate Per kWh  0.9454   0.9453   0.8431   0.8431   0.8431   0.8431   0.8431   0.7703   0.7703   0.2013 
Rate per kWh Including VAT  9.9865   9.6246   9.0332   9.0332   9.0332   9.0332   9.0332   7.3835   7.3835   1.3175 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month August 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial Pub. Bldg. BAPA Commercial Pub. Bldg. Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.8934   6.8934   6.8934   6.8934   6.8934   6.8934   6.8934   8.3496   8.3496   8.3496   8.3496 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)
3 SYSTEM LOSS CHARGE (Php/kWh)  0.8245   0.8245   0.8245   0.8245   0.8245   0.8245   0.8245   (0.0518)  (0.0518)  (0.0518)  (0.0518)
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   167.56   -     -     -     167.56 
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     -     0.4613   0.4441   0.4441   -   
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   46.60   -     46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     -     0.5376   -     -     -   
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     -     0.3205   -     -     -   
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.7175   0.7175   0.7175   0.7175       0.7175   0.7175   0.9284   0.9284   0.9284   0.9284 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
System Loss  Vat  (PhP/kWh)  0.0819   0.0819   0.0819   0.0819   0.0819   0.0819   0.0819   (0.0057)  (0.0057)  (0.0057)  (0.0057)
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.0292   0.1875   0.0825   0.0825   0.0292 
GRAM Rate - VAT Charge (Php/kWh)
ICERA Rate - VAT Charge (Php/kWh)
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  9.6415   8.9593   8.7662   8.7662   8.7662   8.3221   8.3221   10.2215   9.3462   9.3462   8.9021 
12% Vat on Rate Per kWh  0.9869   0.9484   0.8819   0.8819   0.1644   0.8286   0.8286   1.1102   1.0051   1.0051   0.9518 
Rate per kWh Including VAT  10.6284   9.9076   9.6481   9.6481   8.9307   9.1507   9.1507   11.3316   10.3513   10.3513   9.8539 
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month September 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigation/     Water system Public Buildings Street Lights Industrial Industrial Commercial Irrigation/     Water system Public Buildings
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  5.1155   5.1155   5.1155   5.1155   5.1155   5.1155   5.1155   5.1155   5.1155   5.1155   5.1155   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  271.1000   271.1000   271.1000   271.1000   271.1000 
Transmission System Charge (Php/kWh)  1.0872   1.0872   1.2359   1.2359   1.2359   1.2359   1.2359   -     -     -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.6065   0.6065   0.6065   0.6065   0.6065   0.6065   0.6065   0.6065   0.6065   0.6065   0.6065   0.6065 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5676   0.5676   0.5676   0.5676   0.5676   0.5676   0.5676   0.5676   0.5676   0.5676   0.5676   -   
Transmission Vat (Php/kWh)  0.1218   0.1218   0.1385   0.1385   0.1385   0.1385   0.1385   0.1167   0.1167   0.1167   0.1167   0.1167 
System Loss  Vat  (PhP/kWh)  0.0674   0.0674   0.0674   0.0674   0.0674   0.0674   0.0674   0.0674   0.0674   0.0674   0.0674   0.0674 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  8.7328   8.3711   8.0062   8.0062   8.0062   8.0062   8.0062   6.3262   6.3262   6.3262   6.3262   1.0918 
12% Vat on Rate Per kWh  0.9443   0.9442   0.8560   0.8560   0.8560   0.8560   0.8560   0.7809   0.7809   0.7809   0.7809   0.2133 
Rate per kWh Including VAT  9.6771   9.3153   8.8621   8.8621   8.8621   8.8621   8.8621   7.1071   7.1071   7.1071   7.1071   1.3051 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month September 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial Pub. Bldg. BAPA Commercial Pub. Bldg. Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.8848   6.8848   6.8848   6.8848   6.8848   6.8848   6.8848   8.8292   8.8292   8.8292   8.8292 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)
3 SYSTEM LOSS CHARGE (Php/kWh)  0.8214   0.8214   0.8214   0.8214   0.8214   0.8214   0.8214   0.5306   0.5306   0.5306   0.5306 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   167.56   -     -     -     167.56 
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     -     0.4613   0.4441   0.4441   -   
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   46.60   -     46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     -     0.5376   -     -     -   
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     -     0.3205   -     -     -   
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.7104   0.7104   0.7104   0.7104   0.7104   0.7104   0.7104   0.9918   0.9918   0.9918   0.9918 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
System Loss  Vat  (PhP/kWh)  0.0811   0.0811   0.0811   0.0811   0.0811   0.0811   0.0811   0.0596   0.0596   0.0596   0.0596 
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.0292   0.1875   0.0825   0.0825   0.0292 
GRAM Rate - VAT Charge (Php/kWh)
ICERA Rate - VAT Charge (Php/kWh)
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  9.6298   8.9476   8.7545   8.7545   8.7545   8.3104   8.3104   11.2835   10.4082   10.4082   9.9641 
12% Vat on Rate Per kWh  0.9790   0.9405   0.8740   0.8740   0.8740   0.8207   0.8207   1.2388   1.1338   1.1338   1.0805 
Rate per kWh Including VAT  10.6088   9.8880   9.6285   9.6285   9.6285   9.1311   9.1311   12.5223   11.5420   11.5420   11.0446 
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month October 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigation/     Water system Public Buildings Street Lights Industrial Industrial Commercial Irrigation/     Water system Public Buildings
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  5.0465   5.0465   5.0465   5.0465   5.0465   5.0465   5.0465   5.0465   5.0465   5.0465   5.0465   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  245.8400   245.8400   245.8400   245.8400   245.8400 
Transmission System Charge (Php/kWh)  1.0865   1.0865   1.2826   1.2826   1.2826   1.2826   1.2826   -     -     -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.5943   0.5943   0.5943   0.5943   0.5943   0.5943   0.5943   0.5943   0.5943   0.5943   0.5943   0.5943 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5820   0.5820   0.5820   0.5820   0.5820   0.5820   0.5820   0.5820   0.5820   0.5820   0.5820   -   
Transmission Vat (Php/kWh)  0.1218   0.1218   0.1437   0.1437   0.1437   0.1437   0.1437   0.1224   0.1224   0.1224   0.1224   0.1224 
System Loss  Vat  (PhP/kWh)  0.0682   0.0682   0.0682   0.0682   0.0682   0.0682   0.0682   0.0682   0.0682   0.0682   0.0682   0.0682 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  8.6510   8.2893   7.9718   7.9718   7.9718   7.9718   7.9718   6.2451   6.2451   6.2451   6.2451   1.0797 
12% Vat on Rate Per kWh  0.9594   0.9593   0.8763   0.8763   0.8763   0.8763   0.8763   0.8017   0.8017   0.8017   0.8017   0.2198 
Rate per kWh Including VAT  9.6104   9.2486   8.8481   8.8481   8.8481   8.8481   8.8481   7.0468   7.0468   7.0468   7.0468   1.2994 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month October 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial Pub. Bldg. BAPA Commercial Pub. Bldg. Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.8991   6.8991   6.8991   6.8991   6.8991   6.8991   6.8991   7.9788   7.9788   7.9788   7.9788 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)
3 SYSTEM LOSS CHARGE (Php/kWh)  0.8203   0.8203   0.8203   0.8203   0.8203   0.8203   0.8203   0.5729   0.5729   0.5729   0.5729 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   167.56   -     -     -     167.56 
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     -     0.4613   0.4441   0.4441   -   
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   46.60   -     46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     -     0.5376   -     -     -   
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     -     0.3205   -     -     -   
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.7528   0.7528   0.7528   0.7528   0.7528   0.7528   0.7528   0.9163   0.9163   0.9163   0.9163 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
System Loss  Vat  (PhP/kWh)  0.0860   0.0860   0.0860   0.0860   0.0860   0.0860   0.0860   0.0658   0.0658   0.0658   0.0658 
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.0292   0.1875   0.0825   0.0825   0.0292 
GRAM Rate - VAT Charge (Php/kWh)
ICERA Rate - VAT Charge (Php/kWh)
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189   0.1189 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  9.6431   8.9608   8.7678   8.7678   8.7678   8.3237   8.3237   10.4753   9.6000   9.6000   9.1559 
12% Vat on Rate Per kWh  1.0263   0.9877   0.9212   0.9212   0.9212   0.8679   0.8679   1.1696   1.0646   1.0646   1.0113 
Rate per kWh Including VAT  10.6693   9.9486   9.6890   9.6890   9.6890   9.1916   9.1916   11.6449   10.6645   10.6645   10.1671 
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month November 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigation/     Water system Public Buildings Street Lights Industrial Industrial Commercial Irrigation/     Water system Public Buildings
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  5.1960   5.1960   5.1960   5.1960   5.1960   5.1960   5.1960   5.1960   5.1960   5.1960   5.1960   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  285.8800   285.8800   285.8800   285.8800   285.8800 
Transmission System Charge (Php/kWh)  1.1811   1.1811   1.3569   1.3569   1.3569   1.3569   1.3569   -     -     -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.6418   0.6418   0.6418   0.6418   0.6418   0.6418   0.6418   0.6418   0.6418   0.6418   0.6418   0.6418 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025 
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5792   0.5792   0.5792   0.5792   0.5792   0.5792   0.5792   0.5792   0.5792   0.5792   0.5792   -   
Transmission Vat (Php/kWh)  0.1330   0.1330   0.1528   0.1528   0.1528   0.1528   0.1528   0.1285   0.1285   0.1285   0.1285   0.1285 
System Loss  Vat  (PhP/kWh)  0.0717   0.0717   0.0717   0.0717   0.0717   0.0717   0.0717   0.0717   0.0717   0.0717   0.0717   0.0717 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  9.0334   8.5808   8.3339   8.3339   8.3339   8.3339   8.3339   6.5329   6.5329   6.5329   6.5329   1.1296 
12% Vat on Rate Per kWh  0.9714   0.9713   0.8861   0.8861   0.8861   0.8861   0.8861   0.8085   0.8085   0.8085   0.8085   0.2293 
Rate per kWh Including VAT  10.0048   9.5521   9.2200   9.2200   9.2200   9.2200   9.2200   7.3414   7.3414   7.3414   7.3414   1.3590 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month November 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial Pub. Bldg. BAPA Commercial Pub. Bldg. Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  6.1305   6.1305   6.1305   6.1305   6.1305   6.1305   6.1305   8.0175   8.0175   8.0175   8.0175 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)
3 SYSTEM LOSS CHARGE (Php/kWh)  0.7406   0.7406   0.7406   0.7406   0.7406   0.7406   0.7406   0.8739   0.8739   0.8739   0.8739 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   167.56   -     -     -     167.56 
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     -     0.4613   0.4441   0.4441   -   
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   46.60   -     46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     -     0.5376   -     -     -   
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     -     0.3205   -     -     -   
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025 
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.6671   0.6671   0.6671   0.6671   0.6671   0.6671   0.6671   0.9269   0.9269   0.9269   0.9269 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
System Loss  Vat  (PhP/kWh)  0.0762   0.0762   0.0762   0.0762   0.0762   0.0762   0.0762   0.1010   0.1010   0.1010   0.1010 
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.0292   0.1875   0.0825   0.0825   0.0292 
GRAM Rate - VAT Charge (Php/kWh)
ICERA Rate - VAT Charge (Php/kWh)
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005   0.0005 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  8.8856   8.1125   8.0103   8.0103   8.0103   7.5662   7.5662   10.9059   10.0306   10.0306   9.5865 
12% Vat on Rate Per kWh  0.9308   0.8923   0.8258   0.8258   0.8258   0.7725   0.7725   1.2155   1.1104   1.1104   1.0571 
Rate per kWh Including VAT  9.8164   9.0047   8.8361   8.8361   8.8361   8.3387   8.3387   12.1214   11.1410   11.1410   10.6436 
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE - MAIN GRID
For the billing Month December 2025
TYPE OF CHARGE  CUSTOMER CLASS RESIDENTIAL LOW VOLTAGE HIGHER VOLTAGE CONTESTABLE MARKET
NO.  Description Res. / BAPA Sale for Resale Commercial Irrigation/     Water system Public Buildings Street Lights Industrial Industrial Commercial Irrigation/     Water system Public Buildings
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  5.1933   5.1933   5.1933   5.1933   5.1933   5.1933   5.1933   5.1933   5.1933   5.1933   5.1933   -   
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)  175.6000   175.6000   175.6000   175.6000   175.6000 
Transmission System Charge (Php/kWh)  1.1073   1.1073   1.2714   1.2714   1.2714   1.2714   1.2714   -     -     -     -   
3 SYSTEM LOSS CHARGE (Php/kWh)  0.6208   0.6208   0.6208   0.6208   0.6208   0.6208   0.6208   0.6208   0.6208   0.6208   0.6208   0.6208 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW) 167.56 167.56 167.56 167.56  167.56 
Distribution System Charge (Php/kWh) 0.4613 0.4613 0.4441 0.4441 0.4441 0.4441 0.4441
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376 
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   5.00   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   0.3205 
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers
 0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025 
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.5916   0.5916   0.5916   0.5916   0.5916   0.5916   0.5916   0.5916   0.5916   0.5916   0.5916   -   
Transmission Vat (Php/kWh)  0.1181   0.1181   0.1355   0.1355   0.1355   0.1355   0.1355   0.0858   0.0858   0.0858   0.0858   0.0858 
System Loss  Vat  (PhP/kWh)  0.0699   0.0699   0.0699   0.0699   0.0699   0.0699   0.0699   0.0699   0.0699   0.0699   0.0699   0.0699 
 Distribution Vat  0.1875   0.1874   0.0825   0.0825   0.0825   0.0825   0.0825   0.0292   0.0292   0.0292   0.0292   0.0292 
GRAM Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
ICERA Rate - VAT Charge (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
TRANSCO 12 FIT-All (Renewable) (PhP/kWh)  0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -     -     -   
16 BUSINESS TAX
TOTAL RATE per KWH  8.9360   8.4833   8.2248   8.2248   8.2248   8.2248   8.2248   6.5093   6.5093   6.5093   6.5093   1.1087 
12% Vat on Rate Per kWh  0.9670   0.9669   0.8795   0.8795   0.8795   0.8795   0.8795   0.7765   0.7765   0.7765   0.7765   0.1849 
Rate per kWh Including VAT  9.9030   9.4503   9.1043   9.1043   9.1043   9.1043   9.1043   7.2858   7.2858   7.2858   7.2858   1.2936 
Rate per Customer Charge  5.00   5.00   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   0.60   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  -     -     -     -     -     -     -     167.56   167.56   167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  -     -     -     -     -     -     -     20.11   20.11   20.11   20.11   20.11 
ILOCOS SUR ELECTRIC COOPERATIVE, INC.
Santiago, Ilocos Sur
UNBUNDLED RATE SCHEDULE  - SISTER COOP
For the billing Month December 2025
TYPE OF CHARGE  CUSTOMER CLASS MOPRECO/BENECO LUELCO
NO.  Description Residential Low Voltage Higher Voltage Residential Low Voltage Higher Voltage
Res. / BAPA Sale for Resale Commercial Pub. Bldg. Industrial Commercial Pub. Bldg. BAPA Commercial Pub. Bldg. Commercial
GENERATION,             TRANSMISSION COMPANIES AND SYSTEMS LOSS
1 GENERATION CHARGE
Generation System Charge(Php / kWh)  7.5111   7.5111   7.5111   7.5111   7.5111   7.5111   7.5111   8.3760   8.3760   8.3760   8.3760 
2 TRANSMISSION CHARGE
Demand Charge (Php / kW)
Transmission System Charge (Php/kWh)
3 SYSTEM LOSS CHARGE (Php/kWh)  0.9028   0.9028   0.9028   0.9028   0.9028   0.9028   0.9028   0.9515   0.9515   0.9515   0.9515 
System Loss Refund - January 2014 (Php/kWh)
DISTRIBUTION REVENUES (ISECO)
4 DISTRIBUTION CHARGE
Demand Charge (Php/kW)  -     -     -     -     -     167.56   167.56   -     -     -     167.56 
Distribution System Charge (Php/kWh)  0.4613   0.4613   0.4441   0.4441   0.4441   -     -     0.4613   0.4441   0.4441   -   
5 SUPPLY CHARGE
Retail Customer Charge (Php/customer/mo.)  -     -     46.60   46.60   46.60   46.60   46.60   -     46.60   46.60   46.60 
Supply System Charge (Php/kWh)  0.5376   0.5376   -     -     -     -     -     0.5376   -     -     -   
6 METERING CHARGE
Retail Customer Charge (Php/Customer/mo)  5.00   -     32.78   32.78   32.78   32.78   32.78   5.00   32.78   32.78   32.78 
Metering System Charge (Php/kWh)  0.3205   -     -     -     -     -     -     0.3205   -     -     -   
7 RFSC (PhP/kWh)  0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178   0.2178 
8 RFSC - Debt Service (PhP/kWh)  -     -     -     -     -     -     -     -     -     -     -   
9 RFSC - Debt Service 2 (PhP/kWh)  0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247   0.0247 
GOVERNMENT REVENUES
10 UNIVERSAL CHARGES
Missionary Electrification-NPC-SPUG  0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949   0.1949 
Missionary Electrification-Renewable Energy Developers  0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044   0.0044 
Environmental Charge  0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025   0.0025 
NPC Stranded Contract Cost  -     -     -     -     -     -     -     -     -     -   
NPC Stranded Debt  0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428   0.0428 
11 VALUE ADDED TAX
Generation Vat  (Php/kWh)  0.7911   0.7911   0.7911   0.7911   0.7911   0.7911   0.7911   0.9491   0.9491   0.9491   0.9491 
Transmission Vat (Php/kWh)  -     -     -     -     -     -     -     -     -     -     -   
System Loss  Vat  (PhP/kWh)  0.0903   0.0903   0.0903   0.0903   0.0903   0.0903   0.0903   0.1078   0.1078   0.1078   0.1078 
 Distribution Vat  0.1875   0.1490   0.0825   0.0825   0.0825   0.0292   0.0292   0.1875   0.0825   0.0825   0.0292 
GRAM Rate - VAT Charge (Php/kWh)
ICERA Rate - VAT Charge (Php/kWh)
TRANSCO 12 FIT-All) (Renewable) (PhP/kWh)  0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073   0.2073 
OTHERS 13 LIFELINE SUBSIDY RATE (PhP/kWh)  0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006   0.0006 
14 SENIOR CITIZEN SUBSIDY RATE (PhP/kWh)  0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002   0.0002 
PASS-THROUGH TAXES 15 REAL PROPERTY TAX  -     -     -     -     -     -     -     -     -     -   
TOTAL RATE per KWH  10.4285   9.6554   9.5532   9.5532   9.5532   9.1091   9.1091   11.3421   10.4668   10.4668   10.0227 
12% Vat on Rate Per kWh  1.0690   1.0304   0.9639   0.9639   0.9639   0.9106   0.9106   1.2445   1.1394   1.1394   1.0861 
Rate per kWh Including VAT  11.4975   10.6858   10.5171   10.5171   10.5171   10.0198   10.0198   12.5866   11.6062   11.6062   11.1088 
Rate per Customer Charge  5.00   -     79.38   79.38   79.38   79.38   79.38   5.00   79.38   79.38   79.38 
12% VAT on Customer Charge  0.60   -     9.53   9.53   9.53   9.53   9.53   0.60   9.53   9.53   9.53 
Distribution Demand Charge (Per kW)  167.56   167.56   167.56 
12% Vat on Distribution Demand Charge  20.11   20.11   20.11